Caterpillar Hydraulics Plant

Sumter, SC​

About the Project

∨ Type
Design/Build Hard Bid

∨ Market
Industrial

∨ Completion Date
December 2013

170,000 Square Foot Addition to an Existing Manufacturing Facility

The Caterpillar Hydraulic Plant was a Lump Sum design-build project. The project scope included the 170,000-square-foot addition to the existing manufacturing facility which details included:

  • Conventional spread footing for support of structure steel columns, bar joists and metal deck frame.
  • Exterior precast wall panels supported on continuous perimeter footing.
  • 8” unreinforced concrete floor slab in plant area.
  • Office area with structural steel frame, metal stud and EFIS exterior.
  • TPO roof system on plant and office.
  • Roof top HVAC units with gas heat.
  • Plant electrical service complete with Bus Duct.
  • Plant process piping to include compressed air, water, natural gas, weld gas and DI water.
  • Exterior site improvements to include wetlands mitigation, grading, storm drain, access roads, parking and landscaping.